Well the holidays are past and only 11 months till the Christmas 2010 is here before we know it. The Christmas wrapping and everything else was done by 9:00 PM Christmas Eve, with 10 minutes to spare. Overall the holiday was pretty good, no surprises and very, very little arguing from my children. All the Christmas decorations are put away, just have to wait or DH and DS to put them back up in the attic.
I am looking forward to getting several things done and a few things started in 2010. Especially getting the new career going with designing and teaching in the local area. I keep a list of several projects that I am doing (UFOs) and projects that I want to do. This list keeps me grounded as to not adding new projects, and keeps the list in perspective to what I want to finish. In the beginning of 2009 I had 114 items on the list and I might add that this was not a complete list of everything. Not all of these items are quilting, some are sewing garments, to painting, hand needlework, etc. This is the reason why I keep a list to ground me in the right direction, otherwise the list would be in the 2 to 3 hundred range and very little would get finished. As the end of 2009 I completed 25 items. Now you would think that the list would be 89 items on it, well I see things I want to do and buy the fabric or thread or whatever is needed, then a new item is added to the list. As a result the list as of the start of 2010 has 116 items.
No comments:
Post a Comment